Due to our pop video shoot being scheduled for a Monday, we set up our set on the Friday afternoon of the previous week.
We spent the majority of the afternoon clearing the previous pop video set as they hadn’t done it themselves. Once the studio was clear of the previous set we began our own set build. Firstly we positioned the blue screen in place in the background and made sure it was pulled tightly across. Then with help from the technicians, we hang our four light bulbs on the beams which run along the top of the studio roof. We set up the blinders on the left side of the studio and checked they were at the appropriate brightness by turning them on. We laid the previously dried out leaves on the floor evenly and then positioned the drum set under the associated light bulb.
I think that overall the set build went to plan and it didn’t take us too long to achieve the look we wanted. The only problem we had was that we were delayed due to the previous group not taking don’t there own set from the beginning of the day.
We spent the majority of the afternoon clearing the previous pop video set as they hadn’t done it themselves. Once the studio was clear of the previous set we began our own set build. Firstly we positioned the blue screen in place in the background and made sure it was pulled tightly across. Then with help from the technicians, we hang our four light bulbs on the beams which run along the top of the studio roof. We set up the blinders on the left side of the studio and checked they were at the appropriate brightness by turning them on. We laid the previously dried out leaves on the floor evenly and then positioned the drum set under the associated light bulb.
I think that overall the set build went to plan and it didn’t take us too long to achieve the look we wanted. The only problem we had was that we were delayed due to the previous group not taking don’t there own set from the beginning of the day.